Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/12/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-1660
JOB ADDRESS:
5824 LIGHTFOOT LN
FRISCO, TX
DESC:   3451 AC, 4273 SF, SFR / 2 STORY
OWNER:
AMERICAN LEGEND HOMES

LEWISVILLE TX 75056

CONTRACTOR:
AMERICAN LEGEND HOMES

LEWISVILLE TX 75056
ISSUED DATE:
5/28/2015
APPLIED DATE:
4/20/2015
EXPIRED DATE:
5/21/2016
SITE APN:
D648235
STATUS:
COMPLETED
APPLICANT:
AMERICAN LEGEND HOMES

LEWISVILLE TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
257479.11
FEE SUMMARY
INSPECTION SUMMARY
MISCELLANEOUS ELECTRICAL FEES$128.19
MISCELLANOUS MECHANICAL FEES$152.50
MISCELLANEOUS PLUMBING FEES$263.00
BUILDING PERMIT FEE$1,783.75
FENCE FEE$20.00
CREDIT CARD FEE$11.20
2NDS/FRAMING 08/25/2015 GLQ$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
SEWER IMPACT FEE$0.00
WATER IMPACT FEE$1,772.00
THOROUGHFARE IMPACT FEE$3,960.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
FLATWORK 09/29/2015 ADE$30.00
Total Fees:$9,150.64
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  WATER REGISTER
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)