Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/22/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-1604
JOB ADDRESS:
10309 WEDMORE DR
FRISCO, TX 75035
DESC:   2170 AC, 2707 SF, SFR / 1 STORY
OWNER:
GEHAN HOMES LTD
15725 N. Dallas Pkwy
DALLAS TX 75254

CONTRACTOR:
GEHAN HOMES LTD
15725 N. Dallas Pkwy
DALLAS TX 75254
ISSUED DATE:
5/18/2015
APPLIED DATE:
4/15/2015
EXPIRED DATE:
5/7/2016
SITE APN:
C2711964
STATUS:
COMPLETED
APPLICANT:
GEHAN HOMES LTD
15725 N. Dallas Pkwy
DALLAS TX 75254
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
161903.7
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL ROUGH IN 09/01/2015 ADE$30.00
CAMERA 07/20/2015 CB$30.00
GAS RELEASE 10/20/2015 CI$30.00
RESIDENTIAL ELECTRIC FEE$81.21
MISCELLANOUS MECHANICAL FEES$106.50
MISCELLANEOUS PLUMBING FEES$198.00
BUILDING PERMIT FEE$1,303.75
FENCE FEE$20.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.80
DRY WALL 09/11/2015 JCF$30.00
ELECTRICAL FINAL 10/15/2015 JCF$30.00
2NDS/FRAMING 08/26/2015 JDR$30.00
2NDS/FRAMING 08/28/2015 JDR$30.00
PLUMBMECHFINAL 11/04/2015 MRT$30.00
1 INCH PD METER$400.00
WATER METER DEPOSIT$100.00
Total Fees:$2,454.26
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  CAMERA
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  BRICK/WALL TIES
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  GAS RELEASE
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)