Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/1/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-1465
JOB ADDRESS:
3979 NEWMAN BLVD
FRISCO, TX 75033
DESC:   6031 AC, 7832 SF, SFR / 2 STORY
OWNER:
PREMIER RENOVATIONS INC

DALLAS TX 75252

CONTRACTOR:
PREMIER RENOVATIONS INC

DALLAS TX 75252
ISSUED DATE:
6/11/2015
APPLIED DATE:
4/9/2015
EXPIRED DATE:
3/13/2017
SITE APN:
D613102
STATUS:
COMPLETED
APPLICANT:
PREMIER RENOVATIONS INC

DALLAS TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
449972.91
FEE SUMMARY
INSPECTION SUMMARY
FIRE DEPT 1ST INSP FAILED FEE$50.00
FIRE DEPT INSPECTION FEES$50.00
ELECTRICAL FINAL 07/29/2016 ARG$30.00
PLUMBTOPOUT/MECHRGH 01/12/2016 CK$30.00
PLUMBTOPOUT/MECHRGH 01/18/2016 CK$30.00
MISCELLANOUS MECHANICAL FEES$185.50
MISCELLANEOUS PLUMBING FEES$322.00
BUILDING PERMIT FEE$2,743.75
FENCE FEE$20.00
RESIDENTIAL ELECTRIC FEE$234.96
CREDIT CARD FEE$1.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CO/BUILDING FINAL 09/08/2016 JDR$30.00
CO/BUILDING FINAL 09/12/2016 JDR$30.00
WATER METER DEPOSIT$100.00
1.5 INCH PD METER$585.00
GAS RELEASE 04/27/2016 MLM$30.00
FIRE DEPT INSPECTION FEES$234.96
THOROUGHFARE IMPACT FEE$3,971.00
WATER IMPACT FEE$2,106.00
SEWER IMPACT FEE$1,712.00
2NDS/FRAMING 01/25/2016 TGC$30.00
Total Fees:$12,530.37
______  T-POLE
______  METER PAYMENT
______  SET 1 1/2 PD METER
______  PIER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  INSULATION
______  AUTOFIRE SPRK HYDRO
______  DRY WALL
______  LATH
______  LATH
______  GAS RELEASE
______  PLUMBING ROUGH-IN
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)