|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/17/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-1361
|
JOB ADDRESS: 3853 NEWMAN BLVD FRISCO, TX 75033 |
DESC:
5582 AC, 7415 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 6/11/2015
APPLIED DATE:4/3/2015
EXPIRED DATE:1/28/2017
SITE APN:D613106
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 416473.02
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 05/16/2016 ARG | $30.00 |
UTILITY / ROW 06/17/2016 KB | $80.00 |
MISCELLANEOUS ELECTRICAL FEES | $222.45 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
MISCELLANEOUS PLUMBING FEES | $315.00 |
BUILDING PERMIT FEE | $2,578.75 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $7.40 |
CREDIT CARD FEE | $0.60 |
SLAB 07/31/2015 JCF | $30.00 |
2NDS/FRAMING 11/24/2015 JCF | $30.00 |
CO/BUILDING FINAL 06/28/2016 JWE2 | $30.00 |
UTILITY / ROW 06/20/2016 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $3,971.00 |
WATER IMPACT FEE | $2,106.00 |
SEWER IMPACT FEE | $1,712.00 |
INSULATION 12/08/2015 MC | $30.00 |
FLATWORK 05/24/2016 MC | $30.00 |
WATER METER DEPOSIT | $100.00 |
1.5 INCH PD METER | $585.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
CREDIT CARD FEE | $10.00 |
FIRE DEPT INSPECTION FEES | $222.45 |
PLUMBMECHFINAL 11/11/2015 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 11/18/2015 PJ | $30.00 |
GAS RELEASE 05/27/2016 SDC | $30.00 |
PLUMBMECHFINAL 06/17/2016 SDC | $30.00 |
PLUMBMECHFINAL 06/22/2016 SDC | $30.00 |
ELECTRICAL FINAL 05/19/2016 WBH | $30.00 |
FLATWORK 05/25/2016 WBH | $30.00 |
Total Fees: | $13,139.15 |
|
|
| ______ T-POLE |
______ PIER |
______ PIER |
______ METER PAYMENT |
______ SET 1 1/2 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ AUTOFIRE SPRK HYDRO |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBMECHFINAL |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ LATH |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING ROUGH-IN |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|