|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/22/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-1271
|
JOB ADDRESS: 4524 HARVARD LN FRISCO, TX 75034 |
DESC:
6658 AC, 8144 SF, SFR / 2 STORY |
|
OWNER:
VCH CONSTRUCTION LP
17814 Davenport Rd, #113 DALLAS TX 75252
|
CONTRACTOR:
VCH CONSTRUCTION LP
17814 Davenport Rd, #113 DALLAS TX 75252
|
ISSUED DATE: 4/15/2015
APPLIED DATE:3/27/2015
EXPIRED DATE:11/5/2017
SITE APN:ADD66191
STATUS:COMPLETED
|
|
APPLICANT:
VCH CONSTRUCTION LP
17814 Davenport Rd, #113 DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 534879.09
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $257.31 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS PLUMBING FEES | $329.00 |
BUILDING PERMIT FEE | $3,400.00 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
2NDS/FRAMING 06/07/2016 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 05/17/2016 GU | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
FIRE DEPT INSPECTION FEES | $244.32 |
PLUMBMECHFINAL 04/04/2017 PJ | $30.00 |
PLUMBMECHFINAL 04/14/2017 PJ | $30.00 |
PLUMBMECHFINAL 04/17/2017 PJ | $30.00 |
FLATWORK 01/30/2017 TXT | $30.00 |
ELECTRICAL FINAL 01/30/2017 TXT | $30.00 |
ELECTRICAL FINAL 02/01/2017 TXT | $30.00 |
ELECTRICAL FINAL 02/03/2017 WND | $30.00 |
Total Fees: | $5,235.03 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL FINAL |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK HYDRO |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ LATH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|