Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/31/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-1130
JOB ADDRESS:
12944 RAILHEAD CT
FRISCO, TX 75033
DESC:   4883 AC, 5842 SF, SFR / 2 STORY
OWNER:
BELCLAIRE HOMES

LEWISVILLE TX 75056

CONTRACTOR:
BELCLAIRE HOMES

LEWISVILLE TX 75056
ISSUED DATE:
4/3/2015
APPLIED DATE:
3/19/2015
EXPIRED DATE:
4/25/2016
SITE APN:
ADD92130
STATUS:
COMPLETED
APPLICANT:
BELCLAIRE HOMES

LEWISVILLE TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
364320.63
FEE SUMMARY
INSPECTION SUMMARY
MISCELLANEOUS ELECTRICAL FEES$175.26
MISCELLANOUS MECHANICAL FEES$185.50
MISCELLANEOUS PLUMBING FEES$284.00
BUILDING PERMIT FEE$2,318.75
FENCE FEE$20.00
GAS RELEASE 09/02/2015 GU$30.00
SLAB 04/29/2015 JDR$30.00
ELECTRICAL ROUGH IN 06/26/2015 JLM$30.00
2NDS/FRAMING 06/29/2015 JLM$30.00
UTILITY / ROW 10/16/2015 KB$80.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
THOROUGHFARE IMPACT FEE$3,896.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
PLUMBTOPOUT/MECHRGH 06/23/2015 MLM$30.00
PLUMBTOPOUT/MECHRGH 06/23/2015 MLM$30.00
Total Fees:$11,530.51
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  LATH
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  UTILITY / ROW
______  WATER REGISTER
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)