APPROVED DATE: 4/15/2015
|
PERMIT SUB-TYPE: SCHL
|
PERMIT NO: B15-0927
|
JOB ADDRESS: 3535 GUINN GATE DR FRISCO, TX |
DESC:
82585 SQ FT, SCHL / FISD #40 JIMMY & SAMMY VAUGHN ELEMENTA |
|
OWNER:
FRISCO ISD
FRISCO TX 75035
|
CONTRACTOR:
CADENCE MCSHANE CONSTRUCTION
DALLAS TX 75254
|
ISSUED DATE: 6/10/2015
APPLIED DATE:3/9/2015
EXPIRED DATE:12/26/2016
SITE APN:D302187
STATUS:COMPLETED
|
|
APPLICANT:
CORGAN ASSOCIATES
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 16883125
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $8.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
4 INCH COMP METER | $3,000.00 |
ELECTRICAL ROUGH IN 07/24/2015 JB | $35.00 |
FIRE DEPT INSPECTION FEES | $400.00 |
MISCELLANOUS MECHANICAL FEES | $4,022.20 |
MISCELLANEOUS PLUMBING FEES | $7,215.96 |
COMMERCIAL ELECTRIC FEE | $3,223.76 |
COMMERCIAL BUILDING PERMIT FEE | $33,386.01 |
CREDIT CARD FEE | $49.55 |
FIRE DEPT INSPECTION FEES | $75.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
WATER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
FIRE DEPT INSPECTION FEES | $2,477.55 |
CREDIT CARD FEE | $0.70 |
Total Fees: | $55,043.73 |
|
|
| ______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ SLAB |
______ FOOTINGS |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ ELECTRICAL ROUGH IN |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ GREASE TRAP |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ COMM SLAB |
______ D-STEEL |
______ COMM SLAB |
______ COMM SLAB |
______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ COMM SLAB |
______ D-STEEL |
______ PIER |
______ UNDRGR FIRE MAIN FLU |
______ FOOTINGS |
______ T-POLE |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ MECHANICAL ROUGH |
______ ELECTRICAL ROUGH IN |
______ COMM PLUMB TOP OUT |
______ FRAME/ELEC WALL |
______ FRAME/ELEC WALL |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ MECHANICAL ROUGH |
______ FRAME/ELEC WALL |
______ FRAME/ELEC WALL |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ FRAME/ELEC WALL |
______ MECHANICAL ROUGH |
______ COMM PLUMB TOP OUT |
______ INSULATION |
______ AUTOFIRE SPRK HYDRO |
______ GAS RELEASE |
______ COMM SLAB |
______ FRAME/ELEC WALL |
______ MECHANICAL ROUGH |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ AUTOFIRE SPRK VISUAL |
______ MECHANICAL ROUGH |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL RELEASE |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ METER PAYMENT |
______ 4 PD METER |
______ GAS RELEASE |
______ GAS PRESSURE |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ CEILING |
______ COURTESY HEALTH INSP |
______ ELECTRICAL FINAL |
______ FIRE LIFE SAFETY |
______ ELECTRICAL FINAL |
______ FIRE FINAL |
______ HEALTH FINAL |
______ FIRE FINAL |
______ BUILDING FINAL |
______ BUILDING FINAL |
______ COMM CO |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|