Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/10/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-0873
JOB ADDRESS:
2165 HIDALGO LN
FRISCO, TX
DESC:   4100 AC, 4760 SF, SFR / 2 STORY
OWNER:
GRAND HOMES

ADDISON TX 75001

CONTRACTOR:
GRAND HOMES

ADDISON TX 75001
ISSUED DATE:
4/22/2015
APPLIED DATE:
3/3/2015
EXPIRED DATE:
11/22/2016
SITE APN:
D637335
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES

ADDISON TX 75001
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
305901
FEE SUMMARY
INSPECTION SUMMARY
T-POLE 05/06/2015 ADE$30.00
CAMERA 07/09/2015 CB$30.00
CAMERA 12/30/2015 CB$30.00
CAMERA 01/08/2016 CB$30.00
PLUMBTOPOUT/MECHRGH 01/12/2016 CI$30.00
MISCELLANEOUS ELECTRICAL FEES$142.80
MISCELLANOUS MECHANICAL FEES$152.50
MISCELLANEOUS PLUMBING FEES$270.00
BUILDING PERMIT FEE$2,023.75
FENCE FEE$20.00
2NDS/FRAMING 01/15/2016 CW$30.00
CREDIT CARD FEE$2.40
PLAN REVIEW FEE$50.00
2NDS/FRAMING 01/19/2016 JDR$30.00
INSULATION 01/25/2016 JDR$30.00
DRY WALL 02/01/2016 JDR$30.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
GAS RELEASE 03/21/2016 ZH$30.00
Total Fees:$5,080.45
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  T-POLE
______  T-POLE
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  CAMERA
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  LATH
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)