BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/24/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-0538
|
JOB ADDRESS: 13842 POMEGRANATE DR FRISCO, TX 75035 |
DESC:
4024 AC, 5033 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 3/12/2015
APPLIED DATE:2/6/2015
EXPIRED DATE:2/21/2016
SITE APN:C2694246
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 300230.64
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
MISCELLANEOUS ELECTRICAL FEES | $150.99 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
BUILDING PERMIT FEE | $1,998.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 05/08/2015 CW | $30.00 |
2NDS/FRAMING 05/12/2015 CW | $30.00 |
INSULATION 05/20/2015 CW | $30.00 |
INSULATION 05/22/2015 CW | $30.00 |
ELECTRICAL FINAL 07/06/2015 JDR | $30.00 |
UTILITY / ROW 07/22/2015 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT/MECHRGH 04/30/2015 MC | $30.00 |
PLUMBTOPOUT/MECHRGH 04/30/2015 MC | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 07/14/2015 MLM | $30.00 |
PLUMBMECHFINAL 08/04/2015 MLM | $30.00 |
PLUMBMECHFINAL 08/07/2015 MLM | $30.00 |
Total Fees: | $10,164.24 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|