Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/19/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-0488
JOB ADDRESS:
13061 RAILHEAD CT
FRISCO, TX 75033
DESC:   4721 AC, 6318 SF, SFR / 2 STORY
OWNER:
BELCLAIRE HOMES

LEWISVILLE TX 75056

CONTRACTOR:
BELCLAIRE HOMES

LEWISVILLE TX 75056
ISSUED DATE:
2/24/2015
APPLIED DATE:
2/4/2015
EXPIRED DATE:
4/12/2016
SITE APN:
ADD92095
STATUS:
COMPLETED
APPLICANT:
BELCLAIRE HOMES

LEWISVILLE TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
352233.81
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING ROUGH-IN 03/17/2015 CK$30.00
CO/BUILDING FINAL 10/12/2015 CW$30.00
1 INCH CURBSTOP REPAIR / REPLACE$320.00
CREDIT CARD FEE$0.60
ELECTRICAL ROUGH IN 05/22/2015 JLM$30.00
2NDS/FRAMING 05/28/2015 JLM$30.00
UTILITY / ROW 09/21/2015 KB$80.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
RESIDENTIAL ELECTRIC FEE$189.54
MISCELLANOUS MECHANICAL FEES$179.00
MISCELLANEOUS PLUMBING FEES$287.00
BUILDING PERMIT FEE$2,258.75
FENCE FEE$20.00
PLUMBTOPOUT/MECHRGH 05/22/2015 MLM$30.00
PLUMBMECHFINAL 09/15/2015 MRT$30.00
PLUMBMECHFINAL 09/21/2015 MRT$30.00
GAS RELEASE 07/22/2015 PDC$30.00
FIRE DEPT INSPECTION FEES$189.54
THOROUGHFARE IMPACT FEE$3,896.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
Total Fees:$11,551.43
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  FLATWORK
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)