Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/22/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-0117
JOB ADDRESS:
12441 SHOAL FOREST LN
FRISCO, TX 75033
DESC:   3778 AC, 4848 SF, SFR / 2 STORY
OWNER:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034

CONTRACTOR:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
ISSUED DATE:
1/30/2015
APPLIED DATE:
1/12/2015
EXPIRED DATE:
6/18/2016
SITE APN:
ADD81282
STATUS:
COMPLETED
APPLICANT:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
281876.58
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL ELECTRIC FEE$145.44
MISCELLANOUS MECHANICAL FEES$152.50
MISCELLANEOUS PLUMBING FEES$277.00
BUILDING PERMIT FEE$1,903.75
FENCE FEE$20.00
ELECTRICAL FINAL 09/30/2015 CW$30.00
ELECTRICAL FINAL 10/01/2015 CW$30.00
CREDIT CARD FEE$2.00
DRY WALL 07/06/2015 JCF$30.00
2NDS/FRAMING 06/15/2015 JLM$20.00
2NDS/FRAMING 06/19/2015 JLM$30.00
2NDS/FRAMING 06/23/2015 JLM$30.00
INSULATION 07/01/2015 JLM$30.00
2NDS/FRAMING 06/15/2015 JLM$10.00
THOROUGHFARE IMPACT FEE$3,971.00
WATER IMPACT FEE$2,106.00
SEWER IMPACT FEE$1,712.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
PLUMBTOPOUT/MECHRGH 06/09/2015 MLM$30.00
GAS RELEASE 09/30/2015 MRT$30.00
PLUMBMECHFINAL 10/29/2015 MRT$30.00
PLUMBMECHFINAL 11/19/2015 PJ$30.00
Total Fees:$11,119.69
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  LATH
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)