|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/22/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-0117
|
JOB ADDRESS: 12441 SHOAL FOREST LN FRISCO, TX 75033 |
DESC:
3778 AC, 4848 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 1/30/2015
APPLIED DATE:1/12/2015
EXPIRED DATE:6/18/2016
SITE APN:ADD81282
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 281876.58
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $145.44 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
BUILDING PERMIT FEE | $1,903.75 |
FENCE FEE | $20.00 |
ELECTRICAL FINAL 09/30/2015 CW | $30.00 |
ELECTRICAL FINAL 10/01/2015 CW | $30.00 |
CREDIT CARD FEE | $2.00 |
DRY WALL 07/06/2015 JCF | $30.00 |
2NDS/FRAMING 06/15/2015 JLM | $20.00 |
2NDS/FRAMING 06/19/2015 JLM | $30.00 |
2NDS/FRAMING 06/23/2015 JLM | $30.00 |
INSULATION 07/01/2015 JLM | $30.00 |
2NDS/FRAMING 06/15/2015 JLM | $10.00 |
THOROUGHFARE IMPACT FEE | $3,971.00 |
WATER IMPACT FEE | $2,106.00 |
SEWER IMPACT FEE | $1,712.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 06/09/2015 MLM | $30.00 |
GAS RELEASE 09/30/2015 MRT | $30.00 |
PLUMBMECHFINAL 10/29/2015 MRT | $30.00 |
PLUMBMECHFINAL 11/19/2015 PJ | $30.00 |
Total Fees: | $11,119.69 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ LATH |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ MECHANICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|