|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/23/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-9712
|
JOB ADDRESS: 10951 CUSTER TRL FRISCO, TX 75035 |
DESC:
*SEPTIC* 4720 AC, 8206 SF, SFR / 2 STORY |
|
OWNER:
GOODWIN MELINDA &
BRETT S GOODWIN PLANO TX 75025-5023
|
CONTRACTOR:
CAVALRY CONSTRUCTION & CONSULT
COPPELL TX 750169
|
ISSUED DATE: 4/6/2015
APPLIED DATE:12/19/2014
EXPIRED DATE:11/14/2017
SITE APN:C929990
STATUS:COMPLETED
|
|
APPLICANT:
CAVALRY CONSTRUCTION & CONSULT
COPPELL TX 750169
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 396925.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 12/21/2016 CCM | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
PLUMBTOPOUT/MECHRGH 08/26/2016 GU | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
PLUMBMECHFINAL 04/07/2017 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $248.18 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
MISCELLANEOUS PLUMBING FEES | $301.00 |
BUILDING PERMIT FEE | $2,478.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBING ROUGH-IN 07/23/2015 MLM | $30.00 |
PLUMBING ROUGH-IN 07/27/2015 MLM | $30.00 |
PLUMBING ROUGH-IN 07/28/2015 MLM | $30.00 |
Total Fees: | $4,008.73 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ MECHANICAL ROUGH |
______ PLUMBING TOP OUT |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ LATH |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBMECHFINAL |
______ MECHANICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|