|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/14/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-9681
|
JOB ADDRESS: 2285 TALBOT DR FRISCO, TX 75033 |
DESC:
4605 AC, 5558 SF, SFR / 2 STORY |
|
OWNER:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
CONTRACTOR:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
ISSUED DATE: 1/15/2015
APPLIED DATE:12/18/2014
EXPIRED DATE:3/27/2016
SITE APN:D524356
STATUS:COMPLETED
|
|
APPLICANT:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 343579.05
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $166.74 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
MISCELLANEOUS PLUMBING FEES | $294.00 |
BUILDING PERMIT FEE | $2,213.75 |
FENCE FEE | $20.00 |
T-POLE 01/21/2015 CW | $30.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CO/BUILDING FINAL 09/25/2015 JCF | $30.00 |
ELECTRICAL FINAL 09/17/2015 JLM | $30.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 09/16/2015 MRT | $30.00 |
BRICK/WALL TIES 06/12/2015 RRW | $30.00 |
ELECTRICAL FINAL 09/16/2015 RRW | $30.00 |
BRICK/WALL TIES 06/19/2015 JLM | $30.00 |
BRICK/WALL TIES 06/17/2015 JLM | $30.00 |
Total Fees: | $6,481.29 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ UTILITY / ROW |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|