|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/16/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-9454
|
JOB ADDRESS: 13734 ALLEGHENY DR FRISCO, TX 75035 |
DESC:
2853 AC, 3504 SF, SFR / 1 STORY |
|
OWNER:
DR HORTON
4306 Miller Rd. ROWLETT TX 75088
|
CONTRACTOR:
DR HORTON
4306 Miller Rd. ROWLETT TX 75088
|
ISSUED DATE: 2/12/2015
APPLIED DATE:11/26/2014
EXPIRED DATE:4/12/2016
SITE APN:C2707353
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
4306 Miller Rd. ROWLETT TX 75088
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 212862.33
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $2.40 |
SHEATHING 05/04/2015 GLQ | $30.00 |
2NDS/FRAMING 05/04/2015 GLQ | $30.00 |
PLUMBING ROUGH-IN 02/19/2015 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 04/29/2015 GU | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
RESIDENTIAL ELECTRIC FEE | $105.12 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
MISCELLANEOUS PLUMBING FEES | $228.00 |
BUILDING PERMIT FEE | $1,558.75 |
FENCE FEE | $20.00 |
FLATWORK 07/30/2015 JDR | $30.00 |
ELECTRICAL FINAL 08/19/2015 JDR | $30.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBING ROUGH-IN 03/02/2015 MC | $30.00 |
Total Fees: | $9,436.57 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|