|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/23/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-9377
|
JOB ADDRESS: 5565 MONTEREY DR FRISCO, TX 75034 |
DESC:
8396 AC, 11076 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 12/29/2014
APPLIED DATE:11/20/2014
EXPIRED DATE:8/6/2018
SITE APN:C2624040
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 626425.56
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 09/15/2017 CCM | $30.00 |
PLUMBING ROUGH-IN 08/21/2015 CI | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $10.00 |
PLUMBTOPOUT/MECHRGH 03/07/2016 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $332.28 |
MISCELLANOUS MECHANICAL FEES | $244.50 |
MISCELLANEOUS PLUMBING FEES | $434.00 |
BUILDING PERMIT FEE | $3,837.00 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
2NDS/FRAMING 03/16/2016 JCF | $30.00 |
2NDS/FRAMING 04/04/2016 JCF | $30.00 |
2NDS/FRAMING 04/06/2016 JCF | $30.00 |
DRY WALL 05/02/2016 JCF | $30.00 |
ELECTRICAL FINAL 12/22/2016 JWF | $30.00 |
PLUMBMECHFINAL 09/01/2017 JWF | $30.00 |
UTILITIES INSPECTION 11/09/2017 CB | $80.00 |
WATER METER DEPOSIT | $100.00 |
1.5 INCH PD METER | $585.00 |
1.5 INCH PD METER | $2.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
FIRE DEPT INSPECTION FEES | $332.28 |
ELECTRICAL FINAL 01/03/2017 REED | $30.00 |
GAS RELEASE 01/11/2017 SDC | $30.00 |
Total Fees: | $7,886.26 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PIER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ AUTOFIRE SPRK HYDRO |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ LATH |
______ DRY WALL |
______ LATH |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ SWROWINSP |
______ GAS RELEASE |
______ GAS RELEASE |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ FLATWORK |
______ FLATWORK |
______ FENCE |
______ GAS PRESSURE |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ WATER REGISTER |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|