|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/1/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-9007
|
JOB ADDRESS: 13377 CITRUS LN FRISCO, TX 75035 |
DESC:
4055 AC, 5071 SF, SFR / 2 STORY |
|
OWNER:
CHAVEZ GUILLERMO
FRISCO TX 75035-0024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 12/2/2014
APPLIED DATE:10/30/2014
EXPIRED DATE:12/21/2015
SITE APN:C2586239
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 302543.55
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 12/03/2014 ARG | $80.00 |
CAMERA 12/19/2014 CB | $30.00 |
CAMERA 01/22/2015 CB | $30.00 |
SLAB 12/16/2014 GLQ | $30.00 |
FLATWORK 12/18/2014 GLQ | $30.00 |
FLATWORK 12/23/2014 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $152.13 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
BUILDING PERMIT FEE | $2,008.75 |
FENCE FEE | $20.00 |
FLATWORK 12/19/2014 JCF | $30.00 |
2NDS/FRAMING 02/02/2015 JCF | $30.00 |
THOROUGHFARE IMPACT FEE | $2,358.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 05/08/2015 MRT | $30.00 |
BRICK/WALL TIES 04/13/2015 RET | $30.00 |
PLUMBTOPOUT/MECHRGH 01/26/2015 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 01/29/2015 TRC | $30.00 |
ELECTRICAL FINAL 05/11/2015 WBH | $30.00 |
Total Fees: | $9,219.38 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|