|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/24/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-8873
|
JOB ADDRESS: 14456 FALL HARVEST DR FRISCO, TX 75033 |
DESC:
4065 AC, 4782 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES
IRVING TX 75062
|
CONTRACTOR:
SUMEER HOMES
IRVING TX 75062
|
ISSUED DATE: 12/17/2014
APPLIED DATE:10/24/2014
EXPIRED DATE:9/28/2016
SITE APN:ADD81753
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 303289.65
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITY / ROW 02/25/2016 KB | $80.00 |
CREDIT CARD FEE | $5.00 |
RESIDENTIAL ELECTRIC FEE | $143.46 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
BUILDING PERMIT FEE | $2,013.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 08/10/2015 JCF | $30.00 |
SLAB 04/16/2015 JDR | $30.00 |
SLAB 04/17/2015 JDR | $30.00 |
UTILITY / ROW 03/29/2016 KB | $80.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
ELECTRICAL FINAL 10/22/2015 MC | $30.00 |
ELECTRICAL FINAL 10/22/2015 MC | $30.00 |
FLATWORK 09/11/2015 RRW | $30.00 |
2NDS/FRAMING 08/13/2015 WBH | $30.00 |
Total Fees: | $3,461.21 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ 2NDS/FRAMING |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|