|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/24/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-8702
|
JOB ADDRESS: 8871 CRESTVIEW DR FRISCO, TX 75033 |
DESC:
5150 AC, 6815 SF, SFR / 2 STORY |
|
OWNER:
HOLT JAMES W &
CATHERINE HOLT FRISCO TX 75034-1741
|
CONTRACTOR:
POLK DESIGN BUILD
SUITE 104 COLLEYVILLE TX 76034
|
ISSUED DATE: 11/25/2014
APPLIED DATE:10/16/2014
EXPIRED DATE:4/6/2016
SITE APN:C937133
STATUS:COMPLETED
|
|
APPLICANT:
POLK DESIGN BUILD
SUITE 104 COLLEYVILLE TX 76034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 385733.7
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL ELECTRIC FEE | $204.45 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
MISCELLANEOUS PLUMBING FEES | $315.00 |
BUILDING PERMIT FEE | $2,423.75 |
FENCE FEE | $20.00 |
SLAB 01/19/2015 JDR | $30.00 |
ELECTRICAL ROUGH IN 04/17/2015 JLM | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBMECHFINAL 09/25/2015 MLM | $30.00 |
PLUMBMECHFINAL 09/30/2015 MRT | $30.00 |
ELECTRICAL FINAL 08/25/2015 RRW | $30.00 |
Total Fees: | $3,811.70 |
|
|
| ______ PIER |
______ T-POLE |
______ PIER |
______ PLUMBING ROUGH-IN |
______ METER PAYMENT |
______ PIER |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SET 5/8 PD METER |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ INSULATION |
______ LATH |
______ DRY WALL |
______ BRICK/WALL TIES |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|