Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/31/2014 PERMIT SUB-TYPE: SNEW PERMIT NO: B14-8379
JOB ADDRESS:
12727 CANYON OAKS DR
FRISCO, TX
DESC:   4893 AC, 6182 SF, SFR / 2 STORY
OWNER:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034

CONTRACTOR:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
ISSUED DATE:
11/7/2014
APPLIED DATE:
10/7/2014
EXPIRED DATE:
2/7/2016
SITE APN:
D623765
STATUS:
COMPLETED
APPLICANT:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
365066.73
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$3.71
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.60
RESIDENTIAL ELECTRIC FEE$185.46
MISCELLANOUS MECHANICAL FEES$185.50
MISCELLANEOUS PLUMBING FEES$294.00
BUILDING PERMIT FEE$2,323.75
FENCE FEE$20.00
DRY WALL 04/20/2015 JDR$30.00
DRY WALL 04/22/2015 JDR$30.00
ELECTRICAL FINAL 05/22/2015 JLM$30.00
UTILITY / ROW 07/21/2015 KB$80.00
THOROUGHFARE IMPACT FEE$3,896.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
FIRE DEPT INSPECTION FEES$185.46
ELECTRICAL ROUGH IN 02/18/2015 RRW$30.00
Total Fees:$11,188.28
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  LATH
______  LATH
______  INSULATION
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  FLATWORK
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)