Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/30/2014 PERMIT SUB-TYPE: SNEW PERMIT NO: B14-8340
JOB ADDRESS:
3644 BROADMOOR WAY
FRISCO, TX 75033
DESC:   6397 AC, 8048 SF, SFR / 2 STORY
OWNER:
PREMIER RENOVATIONS INC

DALLAS TX 75252

CONTRACTOR:
PREMIER RENOVATIONS INC

DALLAS TX 75252
ISSUED DATE:
11/3/2014
APPLIED DATE:
10/7/2014
EXPIRED DATE:
7/24/2016
SITE APN:
D613065
STATUS:
COMPLETED
APPLICANT:
PREMIER RENOVATIONS INC

DALLAS TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
477280.17
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$2.40
CREDIT CARD FEE$2.40
FLATWORK 10/21/2015 GLQ$30.00
PLUMBTOPOUT/MECHRGH 03/25/2015 GU$30.00
RESIDENTIAL ELECTRIC FEE$241.44
MISCELLANOUS MECHANICAL FEES$198.50
MISCELLANEOUS PLUMBING FEES$357.00
BUILDING PERMIT FEE$2,883.75
FENCE FEE$20.00
2NDS/FRAMING 04/07/2015 JCF$30.00
ELECTRICAL ROUGH IN 03/24/2015 JDR$30.00
ELECTRICAL ROUGH IN 03/27/2015 JDR$30.00
INSULATION 05/12/2015 JLM$30.00
DRY WALL 06/01/2015 JLM$30.00
THOROUGHFARE IMPACT FEE$3,971.00
WATER IMPACT FEE$2,106.00
SEWER IMPACT FEE$1,712.00
FLATWORK 10/27/2015 MC$30.00
WATER METER DEPOSIT$100.00
1.5 INCH PD METER$585.00
CREDIT CARD FEE$13.70
FIRE DEPT INSPECTION FEES$241.44
Total Fees:$12,674.63
______  T-POLE
______  METER PAYMENT
______  PIER
______  SET 1 1/2 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  GAS PRESSURE
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  GAS PRESSURE
______  DRY WALL
______  DRY WALL
______  LATH
______  LATH
______  LATH
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL RELEASE
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)