|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/25/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-7566
|
JOB ADDRESS: 7595 BELLINGRATH DR FRISCO, TX 75035 |
DESC:
3781 AC, 4590 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 12/8/2014
APPLIED DATE:9/15/2014
EXPIRED DATE:11/30/2015
SITE APN:C2693895
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 282100.41
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 01/26/2015 ADE | $30.00 |
PLUMBING ROUGH-IN 01/09/2015 GU | $30.00 |
PLUMBMECHFINAL 05/28/2015 GU | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
RESIDENTIAL ELECTRIC FEE | $137.70 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
BUILDING PERMIT FEE | $1,908.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 05/20/2015 KB | $80.00 |
UTILITY / ROW 05/22/2015 KB | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 03/02/2015 MLM | $30.00 |
PLUMBMECHFINAL 05/22/2015 MRT | $30.00 |
2NDS/FRAMING 03/04/2015 REED | $30.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBTOPOUT/MECHRGH 02/26/2015 TRC | $30.00 |
Total Fees: | $9,628.95 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|