|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/28/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-7543
|
JOB ADDRESS: 3586 HARVEST GLEN DR FRISCO, TX |
DESC:
4017 AC, 4847 SF, SFR / 2 STORY |
|
OWNER:
GREAT KINGSWOOD LAND LP
DALLAS TX 75248
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 10/29/2014
APPLIED DATE:9/12/2014
EXPIRED DATE:11/28/2015
SITE APN:D637352
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 299708.37
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $145.41 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
BUILDING PERMIT FEE | $1,993.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $0.60 |
FLATWORK 04/07/2015 GLQ | $30.00 |
CREDIT CARD FEE | $1.80 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBMECHFINAL 05/27/2015 MRT | $30.00 |
PLUMBTOPOUT/MECHRGH 01/28/2015 PDC | $30.00 |
2NDS/FRAMING 02/06/2015 RET | $30.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
GAS RELEASE 04/10/2015 TRC | $30.00 |
GAS RELEASE 04/14/2015 TRC | $30.00 |
GAS RELEASE 04/16/2015 TRC | $30.00 |
Total Fees: | $4,892.56 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ LATH |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|