APPROVED DATE: 9/2/2014 PERMIT SUB-TYPE: CNEW PERMIT NO: B14-7019
JOB ADDRESS:
9 COWBOYS WAY
FRISCO, TX
DESC:   536623 SQ FT, CNEW / (MU) FRISCO MULTI-USE EVENTS CENT
OWNER:
FRISCO CITY OF

FRISCO TX 75034-3253

CONTRACTOR:
MANHATTAN CONSTRUCTION CO

DALLAS TX 75206
ISSUED DATE:
10/6/2014
APPLIED DATE:
8/12/2014
EXPIRED DATE:
12/3/2017
SITE APN:
C2700168
STATUS:
COMPLETED
APPLICANT:
MANHATTAN CONSTRUCTION CO

DALLAS TX 75206
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
161780150
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$0.50
FIRE DEPT INSPECTION FEES$200.00
6 INCH COMP METER$2,397.50
WATER METER DEPOSIT COMMERCIAL$550.00
6 INCH COMP METER$2,397.50
WATER METER DEPOSIT COMMERCIAL$550.00
COMMERCIAL BUILDING PERMIT FEE$2,202.37
THOROUGHFARE IMPACT FEE$0.00
MISCELLANEOUS ELECTRICAL FEES$9,734.36
MISCELLANOUS MECHANICAL FEES$2,877.37
MISCELLANEOUS PLUMBING FEES$3,125.50
COMMERCIAL BUILDING PERMIT FEE$152,155.45
SEWER IMPACT FEE$80,940.00
WATER IMPACT FEE$88,590.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$1,722.00
FIRE DEPT INSPECTION FEES$6,852.34
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$37.50
FIRE DEPT INSPECTION FEES$25.00
CREDIT CARD FEE$34.44
Total Fees:$354,616.83
______  PLUMBING ROUGH-IN
______  PRE POUR INSP
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PRE POUR INSP
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  SLAB
______  PLUMBING ROUGH-IN
______  ELECTRICAL RELEASE
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PRE POUR INSP
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  UNDRGR FIRE MAIN VIS
______  PLUMBING TOP OUT
______  UNDRGR FIRE MAIN VIS
______  UNDRGR FIRE MAIN FLU
______  UNDRGR FIRE MAIN VIS
______  ELECTRICAL ROUGH IN
______  SHEATHING
______  6 PD METER
______  6 PD METER
______  METER PAYMENT
______  INSULATION
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  PLUMBING TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  MISCFRAME
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  MISCFRAME
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  DRY WALL
______  COMM PLUMB TOP OUT
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  MISCFRAME
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  ELECTRICAL
______  ELECTRICAL RELEASE
______  PLUMBING TOP OUT
______  ELECTRICAL RELEASE
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  ELECTRICAL
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  ELECTRICAL
______  ELECTRICAL RELEASE
______  PLUMBING TOP OUT
______  ELECTRICAL
______  PLUMBING TOP OUT
______  GAS PRESSURE
______  DRY WALL
______  ELECTRICAL
______  ELECTRICAL
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  ELECTRICAL
______  INSULATION
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL
______  PLUMBING TOP OUT
______  INSULATION
______  PLUMBING TOP OUT
______  ELECTRICAL
______  MECHANICAL ROUGH
______  DRY WALL
______  PLUMBING TOP OUT
______  ELECTRICAL
______  PLUMBING TOP OUT
______  DUCT
______  ELEC WALL
______  GAS PRESSURE
______  PLUMBING TOP OUT
______  ELEC WALL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL
______  DRY WALL
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL
______  CEILING
______  ROOF DRAINS
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL
______  DRY WALL
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  PLUMBING TOP OUT
______  AST FUEL
______  CEILING
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  CEILING
______  ELECTRICAL
______  MECHANICAL FINAL
______  CEILING
______  CEILING
______  CEILING
______  CEILING
______  CEILING
______  PLUMBING TOP OUT
______  CEILING
______  MECHANICAL ROUGH
______  CEILING
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  MECHANICAL ROUGH
______  CEILING
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  CEILING
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBING FINAL
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  MECHANICAL FINAL
______  HOOD SUPPRESS SYS
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  AUTOFIRE SPRK HYDRO
______  MISC
______  CEILING
______  CEILING
______  AUTOFIRE ALARM
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL FINAL
______  COURTESY HEALTH INSP
______  AUTOFIRE SPRK HYDRO
______  COMM CO
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  COURTESY HEALTH INSP
______  CEILING
______  FIRE FINAL
______  COMM CO
______  HEALTH FINAL
______  HOOD SUPPRESS SYS
______  LANDSCAPE
______  ACCESS CONTROL ACCEP
______  HOOD SUPPRESS SYS
______  FIRE FINAL
______  COMM CO
______  AST FUEL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)