BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/22/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-5793
|
JOB ADDRESS: 3608 BROADMOOR WAY FRISCO, TX 75033 |
DESC:
5744 AC, 7189 SF, SFR / 2 STORY |
|
OWNER:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
CONTRACTOR:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
ISSUED DATE: 7/22/2014
APPLIED DATE:7/14/2014
EXPIRED DATE:11/22/2015
SITE APN:D613063
STATUS:COMPLETED
|
|
APPLICANT:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 428559.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/29/2014 PXF | $80.00 |
GAS RELEASE 04/03/2015 CK | $30.00 |
THOROUGHFARE IMPACT FEE | $3,971.00 |
WATER IMPACT FEE | $2,106.00 |
SEWER IMPACT FEE | $1,712.00 |
RESIDENTIAL ELECTRIC FEE | $215.67 |
MISCELLANOUS MECHANICAL FEES | $192.00 |
MISCELLANEOUS PLUMBING FEES | $336.00 |
BUILDING PERMIT FEE | $2,638.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
SLAB 08/12/2014 JCF | $30.00 |
CO/BUILDING FINAL 05/20/2015 JCF | $30.00 |
FLATWORK 03/11/2015 JDR | $30.00 |
FLATWORK 03/12/2015 JDR | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
1.5 INCH PD METER | $185.00 |
PLUMBMECHFINAL 05/18/2015 MLM | $30.00 |
FIRE DEPT INSPECTION FEES | $315.67 |
2NDS/FRAMING 10/24/2014 REED | $30.00 |
INSULATION 11/05/2014 REED | $30.00 |
INSULATION 11/10/2014 REED | $30.00 |
DRY WALL 11/19/2014 REED | $30.00 |
Total Fees: | $12,579.69 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 1/2 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ LATH |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ GAS PRESSURE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|