|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/21/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-5622
|
JOB ADDRESS: 4874 TOLEDO BEND DR FRISCO, TX |
DESC:
4765 AC, 5944 SF, SFR / 2 STORY |
|
OWNER:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
CONTRACTOR:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
ISSUED DATE: 7/23/2014
APPLIED DATE:6/27/2014
EXPIRED DATE:10/21/2015
SITE APN:D634591
STATUS:COMPLETED
|
|
APPLICANT:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 355516.65
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 03/11/2015 CK | $30.00 |
2NDS/FRAMING 01/06/2015 CW | $30.00 |
CREDIT CARD FEE | $2.40 |
PLUMBTOPOUT/MECHRGH 11/03/2014 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 12/02/2014 GU | $30.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH PD METER | $400.00 |
WATER METER DEPOSIT | $100.00 |
PLUMBTOPOUT/MECHRGH 10/27/2014 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 10/31/2014 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $178.32 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS PLUMBING FEES | $319.00 |
BUILDING PERMIT FEE | $2,273.75 |
FENCE FEE | $20.00 |
Total Fees: | $7,023.47 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|