|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/4/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-3570
|
JOB ADDRESS: 9961 ROBINWOODS DR FRISCO, TX 75035 |
DESC:
3861 AC, 4797 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES
IRVING TX 75063
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 6/12/2014
APPLIED DATE:5/30/2014
EXPIRED DATE:5/30/2015
SITE APN:C2703914
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 288069.21
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 11/07/2014 ADE | $30.00 |
FLATWORK 11/10/2014 ADE | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $3.40 |
CREDIT CARD FEE | $6.40 |
2NDS/FRAMING 09/23/2014 GLQ | $30.00 |
2NDS/FRAMING 09/24/2014 GLQ | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
RESIDENTIAL ELECTRIC FEE | $143.91 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS PLUMBING FEES | $298.00 |
BUILDING PERMIT FEE | $1,938.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 11/24/2014 KB | $80.00 |
PLUMBTOPOUT/MECHRGH 09/17/2014 KSH | $30.00 |
GAS RELEASE 11/10/2014 KSH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,083.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $320.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
Total Fees: | $10,634.06 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|