APPROVED DATE: 6/25/2014 PERMIT SUB-TYPE: CNEW PERMIT NO: B14-1834
JOB ADDRESS:
4300 COTTON GIN RD
FRISCO, TX
DESC:   117651 SQ FT, CNEW / THE LANDING AT WATERMERE FRISCO
OWNER:
FRISCO AL GROUP LP

SOUTHLAKE TX 76092-6772

CONTRACTOR:
RES ICD, LP DBA INTEGRATED CON

SOUTHLAKE TX 76092
ISSUED DATE:
10/29/2014
APPLIED DATE:
4/25/2014
EXPIRED DATE:
8/28/2017
SITE APN:
D653422
STATUS:
COMPLETED
APPLICANT:
GALIER, TOLSON, FRENCH, DESIGN

BEDFORD TX 76021
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
14000000
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING ROUGH-IN 06/01/2015 CI$35.00
LANDSCAPE 11/22/2016 DB$30.00
CREDIT CARD FEE$0.70
CREDIT CARD FEE$0.60
CREDIT CARD FEE$4.00
2 INCH PD METER$705.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
3 INCH COMP METER$2,290.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$3,529.53
FIRE DEPT INSPECTION FEES$400.00
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$191.10
FIRE DEPT INSPECTION FEES$125.00
FIRE DEPT INSPECTION FEES$50.00
PLAN REVIEW FEE$200.00
PLAN REVIEW FEE$100.00
CREDIT CARD FEE$8.00
MISCELLANOUS MECHANICAL FEES$5,912.55
MISCELLANEOUS PLUMBING FEES$106,189.59
COMMERCIAL ELECTRIC FEE$4,670.00
COMMERCIAL BUILDING PERMIT FEE$27,937.14
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
CREDIT CARD FEE$1.00
Total Fees:$154,704.21
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN VIS
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN VIS
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  METER PAYMENT
______  COMM SLAB
______  T-POLE
______  3 PD METER
______  COMM SLAB
______  SET 2 PD METER
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  SHEATHING
______  UNDRGR FIRE MAIN FLU
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  COMM SLAB
______  LATH
______  MECHANICAL ROUGH
______  LATH
______  COMM SLAB
______  MECHANICAL ROUGH
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  LATH
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  LATH
______  INSULATION
______  LATH
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  CEILING
______  GAS PRESSURE
______  CEILING
______  PLUMBING ROUGH-IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  SHEATHING
______  INSULATION
______  INSULATION
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  INSULATION
______  COMM DRYWALL
______  COMM DRYWALL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  MECHANICAL ROUGH
______  CEILING
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  COMM FRAME
______  FRAME/ELEC WALL
______  ELECTRICAL RELEASE
______  COMM PLUMB TOP OUT
______  CEILING
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  COMM DRYWALL
______  BRICK/WALL TIES
______  COMM DRYWALL
______  MECHANICAL ROUGH
______  LATH
______  COMM DRYWALL
______  FRAME/ELEC WALL
______  COMM FRAME
______  FIREINSULATION
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  INSULATION
______  INSULATION
______  COMM DRYWALL
______  COMM DRYWALL
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  ELECTRICAL ROUGH IN
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  FLATWORK
______  GAS RELEASE
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL RELEASE
______  CEILING
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COURTESY HEALTH INSP
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  MECHANICAL ROUGH
______  FIRE FINAL
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  HEALTH FINAL
______  HEALTH FINAL
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
______  BUILDING FINAL
______  MECHANICAL ROUGH
______  COMM FRAME
______  INSULATION
______  LANDSCAPE
______  COMM CO
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)