BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/25/2014
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B14-1834
|
JOB ADDRESS: 4300 COTTON GIN RD FRISCO, TX |
DESC:
117651 SQ FT, CNEW / THE LANDING AT WATERMERE FRISCO |
|
OWNER:
FRISCO AL GROUP LP
SOUTHLAKE TX 76092-6772
|
CONTRACTOR:
RES ICD, LP DBA INTEGRATED CON
SOUTHLAKE TX 76092
|
ISSUED DATE: 10/29/2014
APPLIED DATE:4/25/2014
EXPIRED DATE:8/28/2017
SITE APN:D653422
STATUS:COMPLETED
|
|
APPLICANT:
GALIER, TOLSON, FRENCH, DESIGN
BEDFORD TX 76021
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 14000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 06/01/2015 CI | $35.00 |
LANDSCAPE 11/22/2016 DB | $30.00 |
CREDIT CARD FEE | $0.70 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $4.00 |
2 INCH PD METER | $705.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
3 INCH COMP METER | $2,290.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
FIRE DEPT INSPECTION FEES | $3,529.53 |
FIRE DEPT INSPECTION FEES | $400.00 |
FIRE DEPT INSPECTION FEES | $75.00 |
FIRE DEPT INSPECTION FEES | $191.10 |
FIRE DEPT INSPECTION FEES | $125.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
PLAN REVIEW FEE | $200.00 |
PLAN REVIEW FEE | $100.00 |
CREDIT CARD FEE | $8.00 |
MISCELLANOUS MECHANICAL FEES | $5,912.55 |
MISCELLANEOUS PLUMBING FEES | $106,189.59 |
COMMERCIAL ELECTRIC FEE | $4,670.00 |
COMMERCIAL BUILDING PERMIT FEE | $27,937.14 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $1.00 |
Total Fees: | $154,704.21 |
|
|
| ______ PLUMBING ROUGH-IN |
______ UNDRGR FIRE MAIN VIS |
______ PLUMBING ROUGH-IN |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ METER PAYMENT |
______ COMM SLAB |
______ T-POLE |
______ 3 PD METER |
______ COMM SLAB |
______ SET 2 PD METER |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ COMM SLAB |
______ SHEATHING |
______ UNDRGR FIRE MAIN FLU |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ COMM SLAB |
______ LATH |
______ MECHANICAL ROUGH |
______ LATH |
______ COMM SLAB |
______ MECHANICAL ROUGH |
______ COMM FRAME |
______ COMM PLUMB TOP OUT |
______ MECHANICAL ROUGH |
______ LATH |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ LATH |
______ INSULATION |
______ LATH |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ CEILING |
______ GAS PRESSURE |
______ CEILING |
______ PLUMBING ROUGH-IN |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL ROUGH |
______ SHEATHING |
______ INSULATION |
______ INSULATION |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ INSULATION |
______ COMM DRYWALL |
______ COMM DRYWALL |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ MECHANICAL ROUGH |
______ CEILING |
______ COMM PLUMB TOP OUT |
______ MECHANICAL ROUGH |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL ROUGH |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL ROUGH |
______ COMM FRAME |
______ FRAME/ELEC WALL |
______ ELECTRICAL RELEASE |
______ COMM PLUMB TOP OUT |
______ CEILING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ COMM DRYWALL |
______ BRICK/WALL TIES |
______ COMM DRYWALL |
______ MECHANICAL ROUGH |
______ LATH |
______ COMM DRYWALL |
______ FRAME/ELEC WALL |
______ COMM FRAME |
______ FIREINSULATION |
______ MECHANICAL ROUGH |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL ROUGH |
______ INSULATION |
______ INSULATION |
______ COMM DRYWALL |
______ COMM DRYWALL |
______ ELECTRICAL ROUGH IN |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ FLATWORK |
______ GAS RELEASE |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL RELEASE |
______ CEILING |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ COURTESY HEALTH INSP |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ FIRE FINAL |
______ MECHANICAL ROUGH |
______ FIRE FINAL |
______ MECHANICAL ROUGH |
______ MECHANICAL ROUGH |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ HEALTH FINAL |
______ HEALTH FINAL |
______ FIRE FINAL |
______ COMM CO |
______ FIRE FINAL |
______ BUILDING FINAL |
______ MECHANICAL ROUGH |
______ COMM FRAME |
______ INSULATION |
______ LANDSCAPE |
______ COMM CO |
______ MECHANICAL ROUGH |
______ MECHANICAL ROUGH |
______ COMM CO |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|