|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/10/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-1095
|
JOB ADDRESS: 3725 CATHEDRAL LAKE DR FRISCO, TX |
DESC:
4798 AC, 5933 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 4/16/2014
APPLIED DATE:4/1/2014
EXPIRED DATE:5/6/2015
SITE APN:D623733
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 357978.78
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 06/04/2014 CB | $30.00 |
FLATWORK 09/29/2014 CW | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL ELECTRIC FEE | $177.99 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
MISCELLANEOUS PLUMBING FEES | $294.00 |
BUILDING PERMIT FEE | $2,283.75 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
SHEATHING 07/09/2014 JDR | $30.00 |
PLUMBTOPOUT/MECHRGH 07/11/2014 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 07/17/2014 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
Total Fees: | $11,009.74 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ INSULATION |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|