|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/20/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-0787
|
JOB ADDRESS: 4042 WING POINT DR FRISCO, TX 75033 |
DESC:
3161 AC, 4144 SF, SFR / 1 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 3/31/2014
APPLIED DATE:3/13/2014
EXPIRED DATE:3/23/2015
SITE APN:ADD86644
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 235842.21
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 05/09/2014 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $124.32 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
MISCELLANEOUS PLUMBING FEES | $240.00 |
BUILDING PERMIT FEE | $1,673.75 |
FENCE FEE | $20.00 |
T-POLE 04/16/2014 GLQ | $30.00 |
SHEATHING 06/19/2014 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 06/30/2014 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 07/01/2014 GU | $30.00 |
THOROUGHFARE IMPACT FEE | $3,869.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 09/03/2014 TRC | $30.00 |
GAS RELEASE 09/10/2014 TRC | $30.00 |
PLUMBMECHFINAL 09/22/2014 TRC | $30.00 |
Total Fees: | $10,171.07 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|