|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/5/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-0599
|
JOB ADDRESS: 2269 BUNNELS FORK RD FRISCO, TX |
DESC:
4937 AC, 6261 SF, SFR / 2 STORY |
|
OWNER:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
CONTRACTOR:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
ISSUED DATE: 3/10/2014
APPLIED DATE:2/26/2014
EXPIRED DATE:9/19/2015
SITE APN:D566537
STATUS:COMPLETED
|
|
APPLICANT:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 368349.57
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL ROUGH IN 06/19/2014 ADE | $30.00 |
BRICK/WALL TIES 08/27/2014 JCF | $30.00 |
PLUMBMECHFINAL 11/20/2014 JTH | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
INSULATION 07/15/2014 REED | $30.00 |
PLUMBTOPOUT/MECHRGH 06/19/2014 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $187.83 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS PLUMBING FEES | $322.00 |
BUILDING PERMIT FEE | $2,338.75 |
FENCE FEE | $20.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
GAS RELEASE 10/21/2014 JTH | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER IMPACT FEE | $1,772.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
Total Fees: | $11,558.58 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|