BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/17/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B14-0086
|
JOB ADDRESS: 3626 BROADMOOR WAY FRISCO, TX 75033 |
DESC:
4996 AC, 6740 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
CONTRACTOR:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
ISSUED DATE: 1/22/2014
APPLIED DATE:1/14/2014
EXPIRED DATE:7/14/2015
SITE APN:D613064
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 372751.56
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 07/01/2014 ADE | $30.00 |
PLUMBING ROUGH-IN 03/07/2014 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $202.20 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
BUILDING PERMIT FEE | $2,358.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $0.60 |
PLUMBMECHFINAL 12/15/2014 GU | $30.00 |
UTILITY / ROW 11/19/2014 KB | $80.00 |
PLUMBTOPOUT/MECHRGH 06/19/2014 KSH | $30.00 |
PLUMBTOPOUT/MECHRGH 06/23/2014 KSH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $100.00 |
1.5 INCH PD METER | $585.00 |
FIRE DEPT INSPECTION FEES | $202.20 |
FIRE DEPT INSPECTION FEES | $202.20 |
ELECTRICAL FINAL 10/27/2014 REED | $30.00 |
Total Fees: | $11,435.05 |
|
|
| ______ METER PAYMENT |
______ SET 1 1/2 PD METER |
______ T-POLE |
______ PIER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ AUTOFIRE SPRK HYDRO |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ AUTOFIRE SPRK VISUAL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBING FINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|