BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/3/2014
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-4278
|
JOB ADDRESS: 3952 NEWMAN BLVD FRISCO, TX 75033 |
DESC:
6283 AC, 9372 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
CONTRACTOR:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
ISSUED DATE: 1/6/2014
APPLIED DATE:12/23/2013
EXPIRED DATE:6/10/2015
SITE APN:D613185
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
PLANO TX 75025
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 468774.63
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
PLUMBTOPOUT/MECHRGH 05/20/2014 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $281.16 |
MISCELLANOUS MECHANICAL FEES | $182.00 |
MISCELLANEOUS PLUMBING FEES | $375.00 |
BUILDING PERMIT FEE | $2,838.75 |
FENCE FEE | $20.00 |
GAS RELEASE 09/30/2014 JTH | $30.00 |
UTILITY / ROW 12/10/2014 KB | $30.00 |
FIRE DEPT INSPECTION FEES | $281.16 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1.5 INCH PD METER | $585.00 |
WATER METER DEPOSIT | $25.00 |
Total Fees: | $11,820.87 |
|
|
| ______ T-POLE |
______ PIER |
______ METER PAYMENT |
______ PIER |
______ SET 1 1/2 PD METER |
______ PIER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ AUTOFIRE SPRK VISUAL |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|