Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/17/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-4176
JOB ADDRESS:
3144 LEANN DR
FRISCO, TX
DESC:   4055 AC, 5097 SF, SFR / 2 STORY
OWNER:
FIRST TEXAS CUSTOM HOMES

DALLAS TX 75201

CONTRACTOR:
FIRST TEXAS CUSTOM HOMES

DALLAS TX 75201
ISSUED DATE:
1/15/2014
APPLIED DATE:
12/12/2013
EXPIRED DATE:
5/17/2015
SITE APN:
D623669
STATUS:
COMPLETED
APPLICANT:
FIRST TEXAS CUSTOM HOMES

DALLAS TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
302543.55
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL FINAL 08/06/2014 ADE$30.00
ELECTRICAL FINAL 08/11/2014 ADE$30.00
CAMERA 02/14/2014 CB$30.00
CREDIT CARD FEE$1.80
2NDS/FRAMING 05/14/2014 GLQ$30.00
2NDS/FRAMING 05/16/2014 GLQ$30.00
RESIDENTIAL ELECTRIC FEE$152.91
MISCELLANOUS MECHANICAL FEES$129.50
MISCELLANEOUS PLUMBING FEES$239.00
BUILDING PERMIT FEE$2,008.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
CAMERA 03/26/2014 CB$30.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
PLUMBTOPOUT/MECHRGH 05/09/2014 MC$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
PLUMBMECHFINAL 10/31/2014 TRC$30.00
T-POLE 01/30/2014 WKT$30.00
Total Fees:$6,762.96
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  CAMERA
______  T-POLE
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)