|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/2/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-4008
|
JOB ADDRESS: 2264 FLAT CREEK RD FRISCO, TX |
DESC:
3912 AC, 5187 SF, SFR / 2 STORY |
|
OWNER:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
CONTRACTOR:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
ISSUED DATE: 12/5/2013
APPLIED DATE:11/25/2013
EXPIRED DATE:7/20/2015
SITE APN:D566540
STATUS:COMPLETED
|
|
APPLICANT:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 291874.32
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 04/14/2014 ADE | $30.00 |
DRY WALL 05/05/2014 ADE | $30.00 |
GAS RELEASE 07/14/2014 BRY | $30.00 |
CAMERA 01/30/2014 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $155.61 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $1,953.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.80 |
UTILITY / ROW 09/16/2014 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
FLATWORK 07/01/2014 TW | $30.00 |
Total Fees: | $10,604.66 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ SET 1 PD METER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|