|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/14/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3889
|
JOB ADDRESS: 7281 SHINGLE MILL RD FRISCO, TX |
DESC:
4838 AC, 5767 SF, SFR / 2 STORY |
|
OWNER:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
CONTRACTOR:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
ISSUED DATE: 11/22/2013
APPLIED DATE:11/11/2013
EXPIRED DATE:4/22/2015
SITE APN:D566557
STATUS:COMPLETED
|
|
APPLICANT:
STANDARD PACIFIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 360963.18
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 06/03/2014 ADE | $30.00 |
GAS RELEASE 07/21/2014 BRY | $30.00 |
PLUMBMECHFINAL 08/01/2014 BRY | $30.00 |
PLUMBMECHFINAL 08/20/2014 BRY | $30.00 |
PLUMBTOPOUT/MECHRGH 03/11/2014 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $173.01 |
MISCELLANOUS MECHANICAL FEES | $149.00 |
MISCELLANEOUS PLUMBING FEES | $309.00 |
BUILDING PERMIT FEE | $2,298.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 03/27/2014 GLQ | $30.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
METER FREEZE BURST | $280.00 |
1 INCH PD METER | $400.00 |
WATER METER DEPOSIT | $75.00 |
Total Fees: | $11,235.76 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ REPL 1 PD METER |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|