|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/14/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3888
|
JOB ADDRESS: 14121 SOWELL DR FRISCO, TX |
DESC:
4066 AC, 5001 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
SUITE 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
SUITE 300 PLANO TX 75024
|
ISSUED DATE: 11/15/2013
APPLIED DATE:11/11/2013
EXPIRED DATE:11/16/2014
SITE APN:C2694408
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
SUITE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 303364.26
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 12/18/2013 ADE | $30.00 |
FLATWORK 12/26/2013 ADE | $30.00 |
CAMERA 12/20/2013 CB | $30.00 |
CAMERA 01/20/2014 CB | $30.00 |
CAMERA 01/21/2014 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $150.03 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $2,013.75 |
FENCE FEE | $20.00 |
PLUMBING ROUGH-IN 12/04/2013 GU | $30.00 |
PLUMBMECHFINAL 05/06/2014 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 03/11/2014 TRC | $30.00 |
PLUMBMECHFINAL 04/24/2014 TRC | $30.00 |
Total Fees: | $9,165.28 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ CAMERA |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|