|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/2/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3362
|
JOB ADDRESS: 7505 ROSE GARDEN BLVD FRISCO, TX |
DESC:
4497 AC, 5406 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 10/7/2013
APPLIED DATE:9/25/2013
EXPIRED DATE:9/21/2014
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 335521.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 10/23/2013 CB | $30.00 |
T-POLE 10/09/2013 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 12/05/2013 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 12/05/2013 GU | $30.00 |
GAS RELEASE 02/04/2014 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 12/03/2013 JWI | $30.00 |
UTILITY / ROW 02/27/2014 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
T-POLE 10/11/2013 REED | $30.00 |
2NDS/FRAMING 12/12/2013 REED | $30.00 |
PLUMBMECHFINAL 02/27/2014 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $162.18 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $295.00 |
BUILDING PERMIT FEE | $2,173.75 |
FENCE FEE | $20.00 |
Total Fees: | $9,445.43 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|