|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/23/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3302
|
JOB ADDRESS: 13229 DIANNA DR FRISCO, TX 75033 |
DESC:
3393 AC, 3820 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 9/24/2013
APPLIED DATE:9/18/2013
EXPIRED DATE:11/26/2014
SITE APN:D619415
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 253151.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 02/05/2014 CK | $25.00 |
PLUMBTOPOUT/MECHRGH 02/12/2014 CK | $30.00 |
PLUMBTOPOUT/MECHRGH 02/17/2014 CK | $30.00 |
PLUMBTOPOUT/MECHRGH 02/19/2014 CK | $30.00 |
ELECTRICAL FINAL 04/23/2014 GLQ | $30.00 |
CO/BUILDING FINAL 05/29/2014 GLQ | $30.00 |
PLUMBMECHFINAL 05/21/2014 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $114.60 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,763.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 02/05/2014 CK | $5.00 |
THOROUGHFARE IMPACT FEE | $858.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
DRY WALL 03/10/2014 RET | $30.00 |
Total Fees: | $7,303.85 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|