APPROVED DATE: 9/19/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3301
|
JOB ADDRESS: 13865 POMEGRANATE DR FRISCO, TX 75035 |
DESC:
3547 AC, 4435 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 9/25/2013
APPLIED DATE:9/18/2013
EXPIRED DATE:3/24/2014
SITE APN:C2694272
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 264641.67
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 12/23/2013 ADE | $30.00 |
INSULATION 12/27/2013 ADE | $30.00 |
INSULATION 12/26/2013 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $133.05 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,818.75 |
FENCE FEE | $20.00 |
PLUMBMECHFINAL 03/06/2014 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,083.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
2NDS/FRAMING 12/16/2013 REED | $30.00 |
2NDS/FRAMING 12/16/2013 REED | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
PLUMBING ROUGH-IN 10/21/2013 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 12/04/2013 TRC | $30.00 |
PLUMBMECHFINAL 03/04/2014 TRC | $30.00 |
Total Fees: | $9,559.30 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ LATH |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|