|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/6/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-3147
|
JOB ADDRESS: 6493 MOUNTAIN SKY RD FRISCO, TX |
DESC:
5127 AC, 6227 SF, SFR / 2 STORY |
|
OWNER:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
CONTRACTOR:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
ISSUED DATE: 9/12/2013
APPLIED DATE:9/3/2013
EXPIRED DATE:11/19/2014
SITE APN:D561535
STATUS:COMPLETED
|
|
APPLICANT:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 382525.47
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 11/05/2013 ADE | $30.00 |
ELECTRICAL ROUGH IN 12/19/2013 ADE | $30.00 |
FLATWORK 04/04/2014 ADE | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $2.40 |
2NDS/FRAMING 01/16/2014 GLQ | $30.00 |
2NDS/FRAMING 01/20/2014 GLQ | $30.00 |
DRY WALL 02/12/2014 GLQ | $30.00 |
FLATWORK 03/28/2014 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 01/08/2014 KSH | $30.00 |
PLUMBTOPOUT/MECHRGH 01/09/2014 KSH | $30.00 |
GAS RELEASE 03/25/2014 KSH | $30.00 |
GAS RELEASE 03/27/2014 KSH | $30.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
FIRE DEPT INSPECTION FEES | $186.81 |
PLUMBMECHFINAL 05/08/2014 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $186.81 |
MISCELLANOUS MECHANICAL FEES | $155.50 |
MISCELLANEOUS PLUMBING FEES | $319.00 |
BUILDING PERMIT FEE | $2,408.75 |
FENCE FEE | $20.00 |
Total Fees: | $4,614.27 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ SHEATHING |
______ LATH |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ WATER REGISTER |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|