|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/12/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-2826
|
JOB ADDRESS: 12464 EMERALD GATE DR FRISCO, TX 75035 |
DESC:
3912 AC, 4620 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
ISSUED DATE: 8/22/2013
APPLIED DATE:8/6/2013
EXPIRED DATE:2/18/2014
SITE APN:C2682665
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 291874.32
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
2NDS/FRAMING 11/04/2013 CW | $30.00 |
DRY WALL 11/18/2013 CW | $30.00 |
CREDIT CARD FEE | $0.80 |
ELECTRICAL FINAL 01/24/2014 JBS | $30.00 |
ELECTRICAL FINAL 01/28/2014 JBS | $20.00 |
RESIDENTIAL ELECTRIC FEE | $138.60 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,953.75 |
FENCE FEE | $20.00 |
GAS RELEASE 02/04/2014 JTH | $30.00 |
PLUMBING ROUGH-IN 08/30/2013 JWI | $30.00 |
ELECTRICAL FINAL 01/28/2014 JBS | $10.00 |
THOROUGHFARE IMPACT FEE | $805.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT/MECHRGH 10/14/2013 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 10/18/2013 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 10/25/2013 TRC | $30.00 |
Total Fees: | $7,415.65 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|