Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/25/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-2528
JOB ADDRESS:
4285 GLENHURST LN
FRISCO, TX 75033
DESC:   4879 AC, 6095 SF, SFR / 2 STORY
OWNER:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069

CONTRACTOR:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069
ISSUED DATE:
12/2/2013
APPLIED DATE:
7/17/2013
EXPIRED DATE:
3/4/2015
SITE APN:
D296552
STATUS:
COMPLETED
APPLICANT:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
327537.9
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 12/27/2013 ARG$80.00
PLUMBING ROUGH-IN 01/06/2014 CK$30.00
PLUMBTOPOUT/MECHRGH 03/25/2014 CK$30.00
PLAN REVIEW FEE$50.00
CREDIT CARD FEE$5.60
CREDIT CARD FEE$3.40
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.20
CREDIT CARD FEE$1.20
CREDIT CARD FEE$1.20
CREDIT CARD FEE$0.60
2NDS/FRAMING 05/22/2014 GLQ$30.00
2NDS/FRAMING 06/05/2014 GLQ$30.00
INSULATION 06/11/2014 GLQ$30.00
INSULATION 06/12/2014 GLQ$30.00
DRY WALL 06/23/2014 GLQ$30.00
GAS RELEASE 08/26/2014 GU$30.00
PLUMBMECHFINAL 09/02/2014 GU$30.00
PLUMBING ROUGH-IN 01/03/2014 JBS$30.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$182.85
MISCELLANOUS MECHANICAL FEES$169.00
MISCELLANEOUS PLUMBING FEES$298.00
BUILDING PERMIT FEE$2,133.75
FENCE FEE$20.00
FLATWORK 07/07/2014 JDR$30.00
ELECTRICAL FINAL 08/01/2014 JDR$30.00
UTILITY / ROW 08/25/2014 KB$80.00
CREDIT CARD FEE$0.60
PLUMBTOPOUT/MECHRGH 05/02/2014 KSH$30.00
PLUMBTOPOUT/MECHRGH 05/07/2014 KSH$30.00
PLUMBTOPOUT/MECHRGH 05/13/2014 KSH$30.00
PLUMBTOPOUT/MECHRGH 05/19/2014 KSH$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
FIRE DEPT INSPECTION FEES$182.85
SLAB 02/03/2014 RET$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
METER FREEZE BURST$280.00
PLUMBTOPOUT/MECHRGH 04/16/2014 TRC$30.00
GAS RELEASE 08/25/2014 TRC$30.00
SLAB 01/30/2014 WKT$30.00
Total Fees:$5,215.85
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  BRICK/WALL TIES
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  BRICK/WALL TIES
______  PLUMBTOPOUT AND MECHRGH
______  BRICK/WALL TIES
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  GAS RELEASE
______  WATER REGISTER
______  GAS RELEASE
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)