|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/11/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-2365
|
JOB ADDRESS: 13220 MAPLETON DR FRISCO, TX 75035 |
DESC:
3676 AC, 4508 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 7/12/2013
APPLIED DATE:7/3/2013
EXPIRED DATE:1/8/2014
SITE APN:C2649894
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 274266.36
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 08/27/2013 GDS | $30.00 |
2NDS/FRAMING 09/03/2013 GDS | $30.00 |
INSULATION 09/09/2013 GDS | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
ELECTRICAL FINAL 10/21/2013 REED | $30.00 |
ELECTRICAL FINAL 10/28/2013 REED | $30.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER IMPACT FEE | $1,911.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,868.75 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
RESIDENTIAL ELECTRIC FEE | $135.24 |
PLUMBTOPOUT/MECHRGH 08/23/2013 KSH | $30.00 |
PLUMBTOPOUT/MECHRGH 08/22/2013 KSH | $30.00 |
PLUMBMECHFINAL 12/10/2013 JWI | $30.00 |
PLUMBMECHFINAL 12/02/2013 JWI | $30.00 |
Total Fees: | $8,568.49 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|