|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/9/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-2363
|
JOB ADDRESS: 6441 MOUNTAIN SKY RD FRISCO, TX |
DESC:
4074 AC, 5221 SF, SFR / 2 STORY |
|
OWNER:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
CONTRACTOR:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
ISSUED DATE: 7/11/2013
APPLIED DATE:7/3/2013
EXPIRED DATE:3/23/2015
SITE APN:D561533
STATUS:COMPLETED
|
|
APPLICANT:
HUNTINGTON HOMES
SUITE 300 FRISCO TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 303961.14
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 04/24/2014 ADE | $30.00 |
INSULATION 05/01/2014 ADE | $30.00 |
ELECTRICAL FINAL 06/27/2014 ADE | $30.00 |
PLUMBMECHFINAL 07/28/2014 BRY | $30.00 |
SET 1 PD METER 07/25/2013 HDJ | $20.00 |
SET 1 PD METER 02/19/2014 XCN | $80.00 |
RESIDENTIAL ELECTRIC FEE | $156.63 |
MISCELLANOUS MECHANICAL FEES | $149.00 |
MISCELLANEOUS PLUMBING FEES | $302.00 |
BUILDING PERMIT FEE | $2,013.75 |
FENCE FEE | $20.00 |
SET 1 PD METER 07/25/2013 HDJ | $60.00 |
SLAB 03/18/2014 GLQ | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
GAS RELEASE 06/27/2014 TRC | $30.00 |
Total Fees: | $3,456.38 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBMECHFINAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|