APPROVED DATE: 7/9/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-2354
JOB ADDRESS:
2087 HAGUE DR
FRISCO, TX 75033
DESC:   4137 AC, 4988 SF, SFR / 2 STORY
OWNER:
TGM HOMES INC

FRISCO TX 75033

CONTRACTOR:
TGM HOMES INC

FRISCO TX 75033
ISSUED DATE:
7/10/2013
APPLIED DATE:
7/2/2013
EXPIRED DATE:
8/20/2014
SITE APN:
D272454
STATUS:
COMPLETED
APPLICANT:
TGM HOMES INC

FRISCO TX 75033
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
308661.57
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 07/26/2013 CB$30.00
T-POLE 07/12/2013 CW$30.00
T-POLE 07/22/2013 CW$30.00
ELECTRICAL ROUGH IN 10/02/2013 JBS$30.00
2NDS/FRAMING 10/07/2013 JBS$30.00
BRICK/WALL TIES 12/13/2013 JBS$30.00
FLATWORK 01/09/2014 JBS$30.00
UTILITY / ROW 02/18/2014 KB$80.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
FENCE FEE$20.00
BUILDING PERMIT FEE$2,038.75
MISCELLANEOUS PLUMBING FEES$260.00
MISCELLANOUS MECHANICAL FEES$129.50
RESIDENTIAL ELECTRIC FEE$149.64
Total Fees:$3,862.89
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  T-POLE
______  SLAB
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  WATER REGISTER
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  GAS RELEASE
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  PLUMBMECHFINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)