Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/24/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-2160
JOB ADDRESS:
11955 ROCKBLUFF DR
FRISCO, TX
DESC:   3123 AC, 4443 SF, SFR / 1 STORY
OWNER:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034

CONTRACTOR:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
ISSUED DATE:
7/1/2013
APPLIED DATE:
6/18/2013
EXPIRED DATE:
12/28/2013
SITE APN:
D558289
STATUS:
COMPLETED
APPLICANT:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
233007.03
FEE SUMMARY
INSPECTION SUMMARY
GAS RELEASE 01/31/2014 CK$30.00
GAS RELEASE 01/29/2014 GU$30.00
ELECTRICAL ROUGH IN 10/17/2013 JBS$30.00
BRICK/WALL TIES 11/18/2013 JBS$30.00
PLUMBTOPOUT/MECHRGH 10/31/2013 JTH$30.00
PLUMBTOPOUT/MECHRGH 11/04/2013 JTH$30.00
PLUMBTOPOUT/MECHRGH 11/07/2013 JTH$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
THOROUGHFARE IMPACT FEE$3,869.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
ELECTRICAL ROUGH IN 10/28/2013 MC$30.00
ELECTRICAL FINAL 01/23/2014 RET$30.00
CO/BUILDING FINAL 02/24/2014 RET$30.00
RESIDENTIAL ELECTRIC FEE$133.29
MISCELLANOUS MECHANICAL FEES$103.00
MISCELLANEOUS PLUMBING FEES$225.00
BUILDING PERMIT FEE$1,663.75
FENCE FEE$20.00
Total Fees:$10,180.04
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)