|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/10/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1913
|
JOB ADDRESS: 6329 CHIMNEY PEAK LN FRISCO, TX |
DESC:
3229 AC, 4227 SF, SFR / 2 STORY |
|
OWNER:
BBL INTEREST LLC DBA LIONSGATE
CARROLLTON TX 75006
|
CONTRACTOR:
BBL INTEREST LLC DBA LIONSGATE
CARROLLTON TX 75006
|
ISSUED DATE: 6/13/2013
APPLIED DATE:5/31/2013
EXPIRED DATE:1/31/2014
SITE APN:D561624
STATUS:COMPLETED
|
|
APPLICANT:
BBL INTEREST LLC DBA LIONSGATE
CARROLLTON TX 75006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 240915.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 10/03/2013 ADE | $30.00 |
GAS RELEASE 12/17/2013 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $126.81 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $1,698.75 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $2.20 |
PLUMBTOPOUT/MECHRGH 09/16/2013 JTH | $30.00 |
UTILITY / ROW 01/02/2014 KB | $80.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
ELECTRICAL ROUGH IN 09/16/2013 RET | $30.00 |
Total Fees: | $2,920.26 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|