Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/6/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-1677
JOB ADDRESS:
12915 WHISTLING STRAITS
FRISCO, TX 75035
DESC:   3510 AC, 4060 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES

IRVING TX 75062

CONTRACTOR:
SUMEER HOMES

IRVING TX 75062
ISSUED DATE:
6/11/2013
APPLIED DATE:
5/15/2013
EXPIRED DATE:
12/8/2013
SITE APN:
C2632002
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES

IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
252554.85
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
CO 01/30/2014 JBS$30.00
RESIDENTIAL ELECTRIC FEE$121.80
MISCELLANEOUS BUILDING PERMIT FEES$62.95
MISCELLANOUS MECHANICAL FEES$129.50
MISCELLANEOUS PLUMBING FEES$246.00
PLAN REVIEW FEE$50.00
BUILDING PERMIT FEE$1,758.75
FENCE FEE$20.00
PLUMBING ROUGH-IN 07/10/2013 JWI$30.00
PLUMBTOPOUT/MECHRGH 09/18/2013 JWI$30.00
ROW RED TAG KB FAILED 1-29-14$80.00
2NDS/FRAMING 09/24/2013 REED$30.00
REPLACE READABLE REGISTER$190.00
Total Fees:$3,254.00
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  WATER REGISTER
______  CO
______  UTILITY / ROW
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)