|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/21/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1671
|
JOB ADDRESS: 605 DUNHILL LN FRISCO, TX |
DESC:
2935 AC, 3576 SF, SFR / 2 STORY |
|
OWNER:
PULTE HOMES
IRVING TX 75063
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 5/30/2013
APPLIED DATE:5/14/2013
EXPIRED DATE:11/26/2013
SITE APN:D562346
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 218980.35
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 09/09/2013 ADE | $30.00 |
FLATWORK 09/10/2013 ADE | $30.00 |
RESIDENTIAL ELECTRIC FEE | $107.28 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
BUILDING PERMIT FEE | $1,588.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
FLATWORK 09/06/2013 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 07/18/2013 JTH | $3.00 |
PLUMBTOPOUT/MECHRGH 07/18/2013 JTH | $30.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
FLATWORK 09/04/2013 MC | $30.00 |
PLUMBTOPOUT/MECHRGH 07/18/2013 JTH | $27.00 |
2NDS/FRAMING 07/25/2013 TW | $30.00 |
2NDS/FRAMING 07/29/2013 TW | $30.00 |
BRICK/WALL TIES 08/08/2013 TW | $30.00 |
Total Fees: | $6,206.53 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|