|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/19/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1665
|
JOB ADDRESS: 11440 ASHLEY LN FRISCO, TX 75035 |
DESC:
4700 AC, 5795 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
2400 Dallas Parkway Suite 510 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 Dallas Parkway Suite 510 PLANO TX 75093
|
ISSUED DATE: 5/30/2013
APPLIED DATE:5/14/2013
EXPIRED DATE:11/26/2013
SITE APN:C2645180
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
2400 Dallas Parkway Suite 510 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 317316.33
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
SLAB 07/03/2013 GDS | $30.00 |
INSULATION 08/23/2013 GDS | $30.00 |
INSULATION 08/26/2013 GDS | $30.00 |
PLUMBING ROUGH-IN 06/21/2013 JBS | $30.00 |
PLUMBING ROUGH-IN 06/24/2013 JBS | $30.00 |
PLUMBING ROUGH-IN 06/25/2013 JBS | $30.00 |
MISCELLANEOUS BUILDING PERMIT FEES | $219.00 |
MISCELLANEOUS ELECTRICAL FEES | $13.41 |
PLAN REVIEW FEE | $50.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBMECHFINAL 11/01/2013 JTH | $30.00 |
ELECTRICAL ROUGH IN 08/01/2013 GDS | $30.00 |
ELECTRICAL ROUGH IN 07/31/2013 GDS | $30.00 |
CREDIT CARD FEE | $3.60 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,083.75 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
RESIDENTIAL ELECTRIC FEE | $160.44 |
Total Fees: | $11,158.00 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ SLAB |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ 2NDS/FRAMING |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ INSULATION |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|